| 1 |
Upgradation & Reconstruction of Mandla - Nainpur Section of NH 543 from Km 190+400 to Km 236+500 to Two Lane with Paved Shoulder Configuration in the State of Madhya Pradesh |
Road
|
Madhya Pradesh |
Ongoing
|
| 2 |
Balance Works of Rehabilitation and upgradation of NH-43 from km 162+120 to km 173+500, length 11.38 km. (Keshkal Bypass) 4-lane with paved shoulder in the state of Chhatisgarh under NHDP-IV through EPC basis. |
Road
|
Chhatisgarh |
Ongoing
|
| 3 |
Rehabilitation and up-gradation of Bihrikala-Dangad-Somatola-Khadgaon ( Package 09 ) Under Group-B Roads at Rajnandgaon in the State of Chhattisgarh (ADB 39.17 Kms). |
Road
|
Chhatisgarh |
Completed
|
| 4 |
Corridor work of Construction of Bemetara Bypass Section (from km 290.747 to km 295.180) of NH-30 (Erstwhile NH-12A) to 4-lane with service lanes in the State of Chhattisgarh through EPC basis. |
Road
|
Chhatisgarh |
Ongoing
|
| 5 |
Rehabilitation and up-gradation of Dongargaon-Khujji-Pinkapar-Jevartala Road ( Package 11 ) Under Group-B Roads at Rajnandgaon in the State of Chhattisgarh (ADB 23.42 Kms). |
Road
|
Chhatisgarh |
Completed
|
| 6 |
Construction of Road Over Bridge (ROB) at R-VZM Branch line connecting Road No. 2 and NH-53 at Nava Raipur Atal Nagar Dist. Raipur (C.G.) |
Road
|
Chhatisgarh |
Ongoing
|
| 7 |
Widening & Strenthening of Kumhari Ahiwara Berla Road Length 17/6 to 68/6
= 51.20 KM including Bridges & culverts at Distt.- Bemetara (C.G.) |
Road
|
Chhatisgarh |
Ongoing
|
| 8 |
Upgradation of ACC Jamul chowk to Nandini Ahiwara road, ( Length - 21.850 Km ) in Distt. Durg. |
Road
|
Chhatisgarh |
Completed
|
| 9 |
Improvement of Crust & Strengthening Work of Raipur- Durg 4-Lane (Including Improvement of Junction) In Km.281.00 to Km 307.600, of N.H.53(Old N.H.06) In Chhattisgarh States |
Road
|
Chhatisgarh |
Completed
|
| 10 |
Rehabilitation and up-gradation of NH-43 from Km 173.00 to Km 183.00 (Kanker to Bedma Section) to two lane with paved shoulder in the State of Chhattisgarh under NHDP-IV through Engineering, Procurement & Construction (EPC). |
Road
|
Chhatisgarh |
Completed
|
| 11 |
LongTerm Output and Performance Based Road Maintenance Work for the roads under division Vidhansabha
Raipur. Road Name:- 1. Simga-Tilda-Kharora-Arang-Nawapara (Sh no.- 20) Km. 1/2 to km. 170/10=88.10 km.,2. Kurud-Kuhakuha-Nari-Katholi (MDR) km. |
Road
|
Chhatisgarh |
Ongoing
|
| 12 |
Construction and maintenance of RCP LWE Kondagaon RD 0.00 KM to 51.00 KM Road Package No- CG26-04 |
Road
|
Chhatisgarh |
Completed
|
| 13 |
Construction of Dholiya Kosa Chandanu Road Length 16.325 K.M. including Bridges & culverts At Distt.- Bemetara (C.G.) |
Road
|
Chhatisgarh |
Completed
|
| 14 |
Widening & Stregthening Of Bhansuli to Khamariya Road (L. 9.60 KM) I/C. Culverts At Dist. Durg Chhattisgarh. |
Road
|
Chhatisgarh |
Completed
|
| 15 |
Construction and maintenance of RCP LWE Kondagaon NH 43 RD 194 to Chiyanar Road Package No- CG2605 |
Road
|
Chhatisgarh |
Completed
|
| 16 |
Construction of Saja- Bortara- Parpodi Road (Bijagond- Parpodi Road Length 12.325 K.M. Including Bridges culverts At Distt.-Bemetara (C.G.) |
Road
|
Chhatisgarh |
Completed
|
| 17 |
Construction & Maintinance of Rural Road Under PMGSY-III Batch-I PKG No CG 05-95 Distt.- Durg. |
Road
|
Chhatisgarh |
Completed
|
| 18 |
Construction Of Chaturdik Roads At Patan In Patan Vidhansabha Length 6.60 K.M. AT DISTT. DURG. |
Road
|
Chhatisgarh |
Completed
|
| 19 |
Construction of Sikola Sonpur Approach Road Length = 2.80 Km And Sikola Sipkonha Approach Road Length = 3.50 Km Total Length 6.30 Km (Group Tender) Dist. Durg |
Road
|
Chhatisgarh |
Completed
|
| 1 |
Replacement of Hot Leveller No-1 of Plate Mill at Bhilai Steel Plant, Bhilai |
Steel
|
Chhatisgarh |
Ongoing
|
| 1 |
Construction of High Level Bridge i/c approaches across Sheonath river on Anjora - Changori - Bharda Road. |
Bridge
|
Chhatisgarh |
Completed
|
| 2 |
Construction of VUP and Service Road at Rasmada Junction (Km. 321+470) on Existing Durg Bypass NH 53 (Old NH-06) Under Road Safety Improvement in The State of Chhattisgarh on Engineering, Procurement and Construction (EPC) Mode |
Bridge
|
Chhatisgarh |
Ongoing
|
| 3 |
Construction Of High Level Bridge Across Jakke Nalla On Boriya (Mokasa) - Jakke Road. |
Bridge
|
Chhatisgarh |
Completed
|
| 4 |
Construction & Maintenance of Bridge PKG LSB 05-15 |
Bridge
|
Chhatisgarh |
Completed
|
| 5 |
Construction & Maintenance of Bridge PKG LSB 05-14 |
Bridge
|
Chhatisgarh |
Completed
|
| 1 |
Construction of Hi tech Krishi Upaj Mandi at Gandai Dist Durg . |
Building
|
Chhatisgarh |
Completed
|
| 2 |
Construction of Hi Tech Krishi Upaj Mandi at Dhamdha Dist Durg . |
Building
|
Chhatisgarh |
Completed
|
| 1 |
Crushing of Agggregate at Churiyari Mines Madhya Pradesh Per Year |
Mining
|
Madhya Pradesh |
Ongoing
|