| 1 |
Balance Works of Rehabilitation and upgradation of NH-43 from km 162+120 to km 173+500, length 11.38 km. (Keshkal Bypass) 4-lane with paved shoulder in the state of Chhatisgarh under NHDP-IV through EPC basis. |
Road
|
Chhatisgarh |
Ongoing
|
| 2 |
Rehabilitation and up-gradation of Bihrikala-Dangad-Somatola-Khadgaon ( Package 09 ) Under Group-B Roads at Rajnandgaon in the State of Chhattisgarh (ADB 39.17 Kms). |
Road
|
Chhatisgarh |
Completed
|
| 3 |
Corridor work of Construction of Bemetara Bypass Section (from km 290.747 to km 295.180) of NH-30 (Erstwhile NH-12A) to 4-lane with service lanes in the State of Chhattisgarh through EPC basis. |
Road
|
Chhatisgarh |
Ongoing
|
| 4 |
Rehabilitation and up-gradation of Dongargaon-Khujji-Pinkapar-Jevartala Road ( Package 11 ) Under Group-B Roads at Rajnandgaon in the State of Chhattisgarh (ADB 23.42 Kms). |
Road
|
Chhatisgarh |
Completed
|
| 5 |
Construction of Road Over Bridge (ROB) at R-VZM Branch line connecting Road No. 2 and NH-53 at Nava Raipur Atal Nagar Dist. Raipur (C.G.) |
Road
|
Chhatisgarh |
Ongoing
|
| 6 |
Upgradation of ACC Jamul chowk to Nandini Ahiwara road, ( Length - 21.850 Km ) in Distt. Durg. |
Road
|
Chhatisgarh |
Completed
|
| 7 |
Improvement of Crust & Strengthening Work of Raipur- Durg 4-Lane (Including Improvement of Junction) In Km.281.00 to Km 307.600, of N.H.53(Old N.H.06) In Chhattisgarh States |
Road
|
Chhatisgarh |
Completed
|
| 8 |
Rehabilitation and up-gradation of NH-43 from Km 173.00 to Km 183.00 (Kanker to Bedma Section) to two lane with paved shoulder in the State of Chhattisgarh under NHDP-IV through Engineering, Procurement & Construction (EPC). |
Road
|
Chhatisgarh |
Completed
|
| 9 |
LongTerm Output and Performance Based Road Maintenance Work for the roads under division Vidhansabha
Raipur. Road Name:- 1. Simga-Tilda-Kharora-Arang-Nawapara (Sh no.- 20) Km. 1/2 to km. 170/10=88.10 km.,2. Kurud-Kuhakuha-Nari-Katholi (MDR) km. |
Road
|
Chhatisgarh |
Ongoing
|
| 10 |
Construction and maintenance of RCP LWE Kondagaon RD 0.00 KM to 51.00 KM Road Package No- CG26-04 |
Road
|
Chhatisgarh |
Completed
|
| 11 |
Construction of Dholiya Kosa Chandanu Road Length 16.325 K.M. including Bridges & culverts At Distt.- Bemetara (C.G.) |
Road
|
Chhatisgarh |
Completed
|
| 12 |
Widening & Stregthening Of Bhansuli to Khamariya Road (L. 9.60 KM) I/C. Culverts At Dist. Durg Chhattisgarh. |
Road
|
Chhatisgarh |
Completed
|
| 13 |
Construction and maintenance of RCP LWE Kondagaon NH 43 RD 194 to Chiyanar Road Package No- CG2605 |
Road
|
Chhatisgarh |
Completed
|
| 14 |
Construction of Saja- Bortara- Parpodi Road (Bijagond- Parpodi Road Length 12.325 K.M. Including Bridges culverts At Distt.-Bemetara (C.G.) |
Road
|
Chhatisgarh |
Ongoing
|
| 15 |
Construction & Maintinance of Rural Road Under PMGSY-III Batch-I PKG No CG 05-95 Distt.- Durg. |
Road
|
Chhatisgarh |
Completed
|
| 16 |
Construction Of Chaturdik Roads At Patan In Patan Vidhansabha Length 6.60 K.M. AT DISTT. DURG. |
Road
|
Chhatisgarh |
Completed
|
| 17 |
Construction of Sikola Sonpur Approach Road Length = 2.80 Km And Sikola Sipkonha Approach Road Length = 3.50 Km Total Length 6.30 Km (Group Tender) Dist. Durg |
Road
|
Chhatisgarh |
Completed
|
| 1 |
Replacement of Hot Leveller No-1 of Plate Mill at Bhilai Steel Plant, Bhilai |
Steel
|
Chhatisgarh |
Ongoing
|
| 1 |
Collection of user fee collection agency on the basis of competitive bidding through e-tender for Tarpongi Fee Plaza on 4-6 lanes with Paved Shoulder of Raipur-Simga under NHDP-IV through EPC mode in the state of Chhattisgarh |
Toll
|
Chhatisgarh |
Completed
|
| 2 |
Collect the User Fee at Khawasa Fee Plaza at Km. 651.750 of NH-7 (new NH-44) for the use of four lane of Mohgaon to Khawasa, Madhya Pradesh/Maharastra Border Section from design Kilometer 624.480 to kilometer 653.770 of National Highway 7 (New NH-44) in t |
Toll
|
Madhya Pradesh |
Completed
|
| 3 |
Collection of user fee at Bhojpuri Fee Plaza at Km 97+516 for Four laning of Simga to Sargaon section from Km 48+580 to Km. 105+980 of National Highway 200 (New NH-130) in the state of Chhattisgarh under NHDP-IV on EPC Mode (Package-II |
Toll
|
Chhatisgarh |
Completed
|
| 4 |
Collection of user fee at Chilakapalem Fee Plaza at Km 616.704 for the section from Km 97.00 to Km 49.00 (New chainage Km 606.204 to Km 654.204) ( Srikakulam to Champavati Section ) of National Highway 5 (NH-5) in the state of Andhra Pradesh under ( Under |
Toll
|
Chhatisgarh |
Completed
|
| 5 |
Collection of user fee at Kumhari Fee Plaza at four lane of Raipur-Durg Section from km 281.000 to 307.600 of National Highway 6 (New NH-53) in the state of Chhattisgarh. |
Toll
|
Chhatisgarh |
Completed
|
| 6 |
Collection of user fee at Pandutala Fee Plaza at two lane of Mandla Chilpi Section from Km 85.400 to 177.750 fo NH-12A (New NH-30) in the State of Madhya Pradesh. |
Toll
|
Madhya Pradesh |
Completed
|
| 7 |
Collection of user fee through fee at Jagtara Fee Plaza at km 94.995 for two/four lane with paved shoulders section for the use of Dhamtari-Kanker section from design ch. 81.500 to km 129.912 (existing km 81.500 to km 130.000) of National Highway 43 (New |
Toll
|
Chhatisgarh |
Completed
|
| 8 |
Collection of user at Mashora FP at km 216.400 for 2/4 lane with paved shoulders section of Bedma Dahikonga section from design ch. 179.400 to km 240.570 existing km 180.000 to km 241.000 of NH 43 (New NH 30) in Chhattisgarh under NHDPIV on EPC mode. |
Toll
|
Chhatisgarh |
Completed
|
| 9 |
Collection of user at Badayiguda Fee Plaza at km 284.420 for two/four lane with paved shoulders section for the use of Dahikonga-Jagdalpur section from design ch. 240.570 to km 297.470 (existing km 241.000 to km 298.000) of National Highway 43 (New NH 30) |
Toll
|
Chhatisgarh |
Completed
|
| 10 |
Collection of user fee at Mudiyapara Fee Plaza at km 225.942 for M.P. Border Chilpi to Kawardha Section from Km 191.422 to Km. 242.300 of NH-30 in the State of Chhattisgarh. |
Toll
|
Chhatisgarh |
Completed
|
| 1 |
Construction of High Level Bridge i/c approaches across Sheonath river on Anjora - Changori - Bharda Road. |
Bridge
|
Chhatisgarh |
Completed
|
| 2 |
Construction of VUP and Service Road at Rasmada Junction (Km. 321+470) on Existing Durg Bypass NH 53 (Old NH-06) Under Road Safety Improvement in The State of Chhattisgarh on Engineering, Procurement and Construction (EPC) Mode |
Bridge
|
Chhatisgarh |
Ongoing
|
| 3 |
Construction Of High Level Bridge Across Jakke Nalla On Boriya (Mokasa) - Jakke Road. |
Bridge
|
Chhatisgarh |
Completed
|
| 4 |
Construction & Maintenance of Bridge PKG LSB 05-15 |
Bridge
|
Chhatisgarh |
Completed
|
| 5 |
Construction & Maintenance of Bridge PKG LSB 05-14 |
Bridge
|
Chhatisgarh |
Completed
|
| 1 |
Construction of Hi tech Krishi Upaj Mandi at Gandai Dist Durg . |
Building
|
Chhatisgarh |
Completed
|
| 2 |
Construction of Hi Tech Krishi Upaj Mandi at Dhamdha Dist Durg . |
Building
|
Chhatisgarh |
Completed
|
| 1 |
Crushing of Agggregate at Churiyari Mines Madhya Pradesh Per Year |
Mining
|
Madhya Pradesh |
Ongoing
|